array(3) { ["company_details"]=> array(13) { ["name"]=> string(15) "TenneT TSO B.V." ["slug"]=> string(22) "861a7-nl-tennet-tso-bv" ["logo"]=> string(84) "https://images.businessradar.com/linkedin_logos/5a366392-afaa-46a3-89e7-f21fd7c71def" ["description"]=> string(1278) "TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future." ["address_street"]=> string(20) "Utrechtseweg 310 M01" ["address_place"]=> string(6) "Arnhem" ["address_region"]=> NULL ["founding_date"]=> NULL ["website_domain"]=> string(9) "tennet.eu" ["website_url"]=> string(21) "https://www.tennet.eu" ["industry_codes"]=> array(1) { [0]=> string(17) "Electric Services" } ["employee_count"]=> int(1191) ["article_count"]=> int(3228) } ["articles"]=> array(9) { [0]=> array(7) { ["title_en"]=> string(82) "A lot of unrest, but will there be high-voltage cables above Gooise nature or not?" ["snippet_en"]=> string(148) "By Pieter Witte It remains unclear whether high-voltage cables will actually be installed above the Huizer Naardereng nature reserve. The route i..." ["url"]=> string(98) "https://nhgooi.nl/nieuws/64221/veel-onrust-maar-komen-geen-hoogspanningskabels-boven-gooise-natuur" ["image_url"]=> string(78) "https://images.businessradar.com/articles/1675dd68-b43a-4536-ad75-105ddd547e69" ["source"]=> string(9) "nhgooi.nl" ["publication_date"]=> string(10) "2024-04-23" ["categories"]=> array(1) { [0]=> string(27) "Fear, Uncertainty and Doubt" } } [1]=> array(7) { ["title_en"]=> string(70) "Draft decision on participation in European balancing energy platforms" ["snippet_en"]=> string(216) "The ACM has published a draft decision that changes the conditions for balancing. The changes are related to the future participation of TenneT TSO B.V. to the European platforms for the exchange of balancing energy." ["url"]=> string(96) "https://www.acm.nl/nl/publicaties/ontwerpbesluit-deelname-europese-platforms-balanceringsenergie" ["image_url"]=> NULL ["source"]=> string(6) "acm.nl" ["publication_date"]=> string(10) "2024-04-16" ["categories"]=> array(1) { [0]=> string(6) "Energy" } } [2]=> array(7) { ["title_en"]=> string(80) "The German transmission system operator is increasing investments in the network" ["snippet_en"]=> string(108) "Better connections are needed to transmit electricity generated from wind and solar power across the country" ["url"]=> string(125) "https://www.energetika-net.com/energetsko-gospodarstvo/njemacki-operator-elektroprijenosnog-sustava-povecava-ulaganja-u-mrezu" ["image_url"]=> string(78) "https://images.businessradar.com/articles/b3189239-1bd3-4c37-9ea1-e4a9e7d1578a" ["source"]=> string(18) "energetika-net.com" ["publication_date"]=> string(10) "2024-04-12" ["categories"]=> array(4) { [0]=> string(6) "Energy" [1]=> string(17) "Energy Management" [2]=> string(19) "Foreign Development" [3]=> string(34) "Physical Impacts of Climate Change" } } [3]=> array(7) { ["title_en"]=> string(68) "TenneT gauges interest in new cooperation model offshore maintenance" ["snippet_en"]=> string(131) "TenneT is taking the initiative to jointly house management and maintenance services of the offshore infrastructure in a new model." ["url"]=> string(114) "https://ocean-energyresources.com/2024/04/09/tennet-gauges-interest-in-new-cooperation-model-offshore-maintenance/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/fc806f97-3760-4099-a0cd-1dd37918f96a" ["source"]=> string(25) "ocean-energyresources.com" ["publication_date"]=> string(10) "2024-04-09" ["categories"]=> array(2) { [0]=> string(18) "Expansion & Growth" [1]=> string(13) "Collaboration" } } [4]=> array(7) { ["title_en"]=> string(138) "Arnhem energy front Alliander, Dekra, DNV, KEMA Labs, and TenneT join forces as partners of Arnhem Electricity Week - Cyprus Shipping News" ["snippet_en"]=> string(298) "Alliander, DEKRA, DNV, KEMA Labs, and TenneT are joining forces as partners of Arnhem Electricity Week. As leading players in the energy industry, these organizations support the initiative of Arnhem Electricity Week and collaborate to promote sustainable energy solutions and attract talent to the" ["url"]=> string(154) "https://cyprusshippingnews.com/2024/04/10/arnhem-energy-front-alliander-dekra-dnv-kema-labs-and-tennet-join-forces-as-partners-of-arnhem-electricity-week/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/193c98d5-fdfc-40f3-b4c2-cc55f3be9f01" ["source"]=> string(22) "cyprusshippingnews.com" ["publication_date"]=> string(10) "2024-04-08" ["categories"]=> array(4) { [0]=> string(6) "Energy" [1]=> string(22) "Sustainable Investment" [2]=> string(17) "Energy Management" [3]=> string(13) "Collaboration" } } [5]=> array(7) { ["title_en"]=> string(67) "Skopos: Eight benefits of Integration Platform as a Service (iPaaS)" ["snippet_en"]=> string(154) "In organizations' search for a seamless and scalable digital infrastructure, iPaaS (Integration Platform as a Service) is becoming increasingly prominent." ["url"]=> string(102) "https://www.consultancy.nl/nieuws/52560/skopos-8-voordelen-van-integration-platform-as-a-service-ipaas" ["image_url"]=> string(78) "https://images.businessradar.com/articles/1b2ddcd9-6603-46a7-9323-14ebb00e1f30" ["source"]=> string(14) "consultancy.nl" ["publication_date"]=> string(10) "2024-04-08" ["categories"]=> array(6) { [0]=> string(20) "Business Development" [1]=> string(10) "New Market" [2]=> string(15) "Deals & Tenders" [3]=> string(14) "Product Launch" [4]=> string(13) "Collaboration" [5]=> string(20) "Contract negotiation" } } [6]=> array(7) { ["title_en"]=> string(106) "Comment: Limburg must be higher on Tennet's priority list, otherwise the consequences will be catastrophic" ["snippet_en"]=> string(121) "The clock is something you'd rather not race against. Time is rigid, cannot be stopped and time is not subject to reason." ["url"]=> string(49) "https://www.limburger.nl/cnt/dmf20240405_95342080" ["image_url"]=> string(78) "https://images.businessradar.com/articles/6aa53b36-aa0e-4288-8ef9-4ce742da9765" ["source"]=> string(12) "limburger.nl" ["publication_date"]=> string(10) "2024-04-05" ["categories"]=> array(0) { } } [7]=> array(7) { ["title_en"]=> string(53) "Amended X-factor decision TenneT Net op Zee 2022-2026" ["snippet_en"]=> string(140) "The ACM has adopted the amended x-factor decision by the grid operator of the Offshore Net 2022-2026 following the CBb's ruling of 4-7-2023." ["url"]=> string(87) "https://www.acm.nl/nl/publicaties/gewijzigd-x-factorbesluit-tennet-net-op-zee-2022-2026" ["image_url"]=> NULL ["source"]=> string(6) "acm.nl" ["publication_date"]=> string(10) "2024-04-03" ["categories"]=> array(1) { [0]=> string(18) "Expansion & Growth" } } [8]=> array(7) { ["title_en"]=> string(52) "Amended X-factor decision TenneT Transport 2022-2026" ["snippet_en"]=> string(116) "The ACM has adopted the amended x-factor decision TenneT Transport 2022-2026 following the CBb's ruling of 4-7-2023." ["url"]=> string(86) "https://www.acm.nl/nl/publicaties/gewijzigd-x-factorbesluit-tennet-transport-2022-2026" ["image_url"]=> NULL ["source"]=> string(6) "acm.nl" ["publication_date"]=> string(10) "2024-04-03" ["categories"]=> array(0) { } } } ["category_annotations"]=> array(30) { [0]=> array(2) { ["name"]=> string(17) "Energy Management" ["count"]=> int(944) } [1]=> array(2) { ["name"]=> string(19) "Green & Responsible" ["count"]=> int(395) } [2]=> array(2) { ["name"]=> string(20) "Alternative Energies" ["count"]=> int(345) } [3]=> array(2) { ["name"]=> string(6) "Energy" ["count"]=> int(290) } [4]=> array(2) { ["name"]=> string(18) "Expansion & Growth" ["count"]=> int(259) } [5]=> array(2) { ["name"]=> string(15) "Deals & Tenders" ["count"]=> int(253) } [6]=> array(2) { ["name"]=> string(6) "Outage" ["count"]=> int(177) } [7]=> array(2) { ["name"]=> string(13) "Collaboration" ["count"]=> int(147) } [8]=> array(2) { ["name"]=> string(18) "General Investment" ["count"]=> int(145) } [9]=> array(2) { ["name"]=> string(5) "Legal" ["count"]=> int(93) } [10]=> array(2) { ["name"]=> string(5) "Award" ["count"]=> int(91) } [11]=> array(2) { ["name"]=> string(13) "GHG Emissions" ["count"]=> int(91) } [12]=> array(2) { ["name"]=> string(18) "Ecological Impacts" ["count"]=> int(76) } [13]=> array(2) { ["name"]=> string(11) "Acquisition" ["count"]=> int(71) } [14]=> array(2) { ["name"]=> string(8) "Politics" ["count"]=> int(64) } [15]=> array(2) { ["name"]=> string(14) "Product Launch" ["count"]=> int(58) } [16]=> array(2) { ["name"]=> string(19) "Investment Requests" ["count"]=> int(53) } [17]=> array(2) { ["name"]=> string(5) "R & D" ["count"]=> int(48) } [18]=> array(2) { ["name"]=> string(22) "Sustainable Investment" ["count"]=> int(48) } [19]=> array(2) { ["name"]=> string(24) "Quarterly/Annual Figures" ["count"]=> int(43) } [20]=> array(2) { ["name"]=> string(19) "Foreign Development" ["count"]=> int(40) } [21]=> array(2) { ["name"]=> string(20) "Contract negotiation" ["count"]=> int(40) } [22]=> array(2) { ["name"]=> string(33) "Materials Sourcing and Efficiency" ["count"]=> int(37) } [23]=> array(2) { ["name"]=> string(17) "Electric Vehicles" ["count"]=> int(37) } [24]=> array(2) { ["name"]=> string(19) "Government Policies" ["count"]=> int(37) } [25]=> array(2) { ["name"]=> string(24) "Government Interventions" ["count"]=> int(36) } [26]=> array(2) { ["name"]=> string(15) "Market Movement" ["count"]=> int(34) } [27]=> array(2) { ["name"]=> string(10) "Divestment" ["count"]=> int(32) } [28]=> array(2) { ["name"]=> string(34) "Physical Impacts of Climate Change" ["count"]=> int(25) } [29]=> array(2) { ["name"]=> string(12) "Board Change" ["count"]=> int(24) } } } 861a7-nl-tennet-tso-bv

TenneT TSO B.V.

Location

Founded

Website

https://www.tennet.eu

Articles

3228 Articles

Category

Electric Services

Description

TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future.

Articles

A lot of unrest, but will there be high-voltage cables above Gooise nature or not?

2024-04-23 (nhgooi.nl)

A lot of unrest, but will there be high-voltage cables above Gooise nature or not?

By Pieter Witte It remains unclear whether high-voltage cables will actually be installed above the Huizer Naardereng nature reserve. The route i...

Read more
Draft decision on participation in European balancing energy platforms

2024-04-16 (acm.nl)

Draft decision on participation in European balancing energy platforms

The ACM has published a draft decision that changes the conditions for balancing. The changes are related to the future participation of TenneT TSO B.V. to the European platforms for the exchange of balancing energy.

Read more
The German transmission system operator is increasing investments in the network

2024-04-12 (energetika-net.com)

The German transmission system operator is increasing investments in the network

Better connections are needed to transmit electricity generated from wind and solar power across the country

Read more
TenneT gauges interest in new cooperation model offshore maintenance

2024-04-09 (ocean-energyresources.com)

TenneT gauges interest in new cooperation model offshore maintenance

TenneT is taking the initiative to jointly house management and maintenance services of the offshore infrastructure in a new model.

Read more
Arnhem energy front Alliander, Dekra, DNV, KEMA Labs, and TenneT join forces as partners of Arnhem Electricity Week - Cyprus Shipping News

2024-04-08 (cyprusshippingnews.com)

Arnhem energy front Alliander, Dekra, DNV, KEMA Labs, and TenneT join forces as partners of Arnhem Electricity Week - Cyprus Shipping News

Alliander, DEKRA, DNV, KEMA Labs, and TenneT are joining forces as partners of Arnhem Electricity Week. As leading players in the energy industry, these organizations support the initiative of Arnhem Electricity Week and collaborate to promote sustainable energy solutions and attract talent to the

Read more
Skopos: Eight benefits of Integration Platform as a Service (iPaaS)

2024-04-08 (consultancy.nl)

Skopos: Eight benefits of Integration Platform as a Service (iPaaS)

In organizations' search for a seamless and scalable digital infrastructure, iPaaS (Integration Platform as a Service) is becoming increasingly prominent.

Read more
Comment: Limburg must be higher on Tennet's priority list, otherwise the consequences will be catastrophic

2024-04-05 (limburger.nl)

Comment: Limburg must be higher on Tennet's priority list, otherwise the consequences will be catastrophic

The clock is something you'd rather not race against. Time is rigid, cannot be stopped and time is not subject to reason.

Read more
Amended X-factor decision TenneT Net op Zee 2022-2026

2024-04-03 (acm.nl)

Amended X-factor decision TenneT Net op Zee 2022-2026

The ACM has adopted the amended x-factor decision by the grid operator of the Offshore Net 2022-2026 following the CBb's ruling of 4-7-2023.

Read more
Amended X-factor decision TenneT Transport 2022-2026

2024-04-03 (acm.nl)

Amended X-factor decision TenneT Transport 2022-2026

The ACM has adopted the amended x-factor decision TenneT Transport 2022-2026 following the CBb's ruling of 4-7-2023.

Read more

Newsletter subscription