Ballast Nedam Infra B.V.
Location
Utrecht
Founded
1970-12-29
Website
Risk Signals
515 news mentions monitored
Industry Context
This company is tracked across risk categories, including those related to its sector (e.g., Operative Builders, Heavy Construction, Not Elsewhere Classified, Refuse Systems, Engineering Services), including supply chain integrity, ESG practices, labor disputes, and regulatory compliance.
Filter risk signals by topic
Select a theme below to explore the company’s news mentions in specific risk areas.
Recent Articles about Ballast Nedam Infra B.V.
Live alerts from global media, monitored by Business Radar
2025-04-14 (otar.nl)
Ballast Nedam Infra and Hakkers hydraulic Engineering sign Contract Bouw Zeesteiger in Brunsbüttel, Germany -
Ballast Nedam Infra & Hakkers Hywaterbouw continued successful collaboration with the construction of a large sea gig in Germany Ballast Nedam Infra and Hakkers Hywaterbouw are once again joining forces for […]
Read more2025-03-25 (cobouw.nl)
Ballast Nedam and Schiphol are increasing claims in battle A-pier
Schiphol claims at least 184 million euros from Ballast Nedam in the dragging conflict on the construction of the A-Pier. The builder in turn demands 282 million from the airport.
Read more2024-09-27 (propertynl.com)
PropertyNL Top-60 Real Estate Lawyers
The profiles of the real estate lawyers in alphabetical order.
Read more2024-09-11 (bouwenuitvoering.nl)
Van der Kunbuurt is being redeveloped, Ballast Nedam is building 335 homes there
Amsterdam has chosen Ballast Nedam to redevelop the Van der Kunbuurt. There will be approximately 335 homes here. Construction will start at the end of 2026.
Read more2024-03-16 (transport-online.nl)
Builders: Schiphol failed to deliver detailed design A-Pier | Transport online
AMSTERDAM-During the construction of the A-Pier at the airport, Schiphol has always failed to supply a detailed design by BN/TAV, a company of Ballast Nedam and TAV. As a result, the company was unable to perform work properly, she stated on Monday during a hearing in the court in Amsterdam.
Read more
2023-12-01 (missethoreca.nl)
Million-dollar claims against Van Eijl family company due to construction delay Amrâth Utrecht
The delay in the construction of Galaxy Tower in Utrecht, which will include an Amrâth hotel, has increased to 2.5 years. Both contractor Ballast Nedam and installer Homij have submitted millions of claims to client De Lelie, the real estate company of the Van Eijl family - also the owners of
Read more2023-11-17 (vastgoedjournaal.nl)
Lawyer to mediate between De Lelie real estate and Ballast Nedam about Galaxy Tower - Vastgoedjournaal.nl
A lawyer will mediate in the protracted conflict between De Lelie real estate and Ballast Nedam over the construction of Galaxy Tower. Construction of the hotel, with housing on top of it, has been at a standstill since the end of last year. The tower should have been completed in 2021.
Read more2023-10-17 (oogtv.nl)
Ballast Nedam withdraws from Feringa building, RUG looking for new contractor
The Feringa building on the Zernike Campus is being completed by another contractor. Construction company Ballast Nedam has returned the order. This is what RTV Noord writes. A spokesperson tells the region
Read more2023-06-22 (porttechnology.org)
Port of Rotterdam constructs new site at APMT Maasvlakte II
The Port of Rotterdam Authority has signed a deal with Boskalis for the development of around 40 hectares of new property.
Read more