array(3) { ["company_details"]=> array(13) { ["name"]=> string(15) "TenneT TSO B.V." ["slug"]=> string(22) "861a7-nl-tennet-tso-bv" ["logo"]=> string(84) "https://images.businessradar.com/linkedin_logos/5a366392-afaa-46a3-89e7-f21fd7c71def" ["description"]=> string(1278) "TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future." ["address_street"]=> string(20) "Utrechtseweg 310 M01" ["address_place"]=> string(6) "Arnhem" ["address_region"]=> NULL ["founding_date"]=> NULL ["website_domain"]=> string(9) "tennet.eu" ["website_url"]=> string(21) "https://www.tennet.eu" ["industry_codes"]=> array(1) { [0]=> string(17) "Electric Services" } ["employee_count"]=> int(1191) ["article_count"]=> int(3240) } ["articles"]=> array(9) { [0]=> array(7) { ["title_en"]=> string(95) "'Energy transition under pressure due to grid management tariffs and lack of industrial policy'" ["snippet_en"]=> string(168) "Market prices for energy have fallen significantly compared to a year ago. However, high grid management rates threaten to set the Dutch green energy transition behind." ["url"]=> string(122) "https://www.consultancy.nl/nieuws/52473/energietransitie-onder-druk-door-netbeheertarieven-en-gebrek-aan-industriepolitiek" ["image_url"]=> string(78) "https://images.businessradar.com/articles/a00b5e7a-a8c0-47e1-97b5-2468b0551880" ["source"]=> string(14) "consultancy.nl" ["publication_date"]=> string(10) "2024-03-26" ["categories"]=> array(5) { [0]=> string(17) "Energy Management" [1]=> string(18) "Ecological Impacts" [2]=> string(20) "Alternative Energies" [3]=> string(6) "Energy" [4]=> string(46) "Management of Legal and Regulatory Environment" } } [1]=> array(7) { ["title_en"]=> string(99) "Always up to date with current green energy figures, thanks to the national dashboard | Change Inc." ["snippet_en"]=> string(130) "The National Energy Dashboard provides insight into the use and consumption of gas and electricity. The data is freely accessible." ["url"]=> string(115) "https://www.change.inc/energie/hoeveel-duurzame-stroom-gebruikt-nederland-op-dit-moment-deze-website-weet-het-40887" ["image_url"]=> string(78) "https://images.businessradar.com/articles/264ab7a1-663b-4256-bfec-3913618d4b58" ["source"]=> string(10) "change.inc" ["publication_date"]=> string(10) "2024-03-22" ["categories"]=> array(3) { [0]=> string(17) "Energy Management" [1]=> string(20) "Alternative Energies" [2]=> string(6) "Energy" } } [2]=> array(7) { ["title_en"]=> string(40) "CAT in the CCM network expansion project" ["snippet_en"]=> string(306) "The prerequisite for the energy transition is to transport wind power from north to south. In order for this to be successful, not only above-ground power lines are needed, but also many kilometers of underground cables that are installed in a cable protection pipe system. This is especially true for this" ["url"]=> string(90) "https://www.bauforum24.biz/news/caterpillar-zeppelin/cat-beim-netzausbauprojekt-ccm-r9774/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/efdec4b9-4ea2-4bfa-beb8-701b970e7a2d" ["source"]=> string(14) "bauforum24.biz" ["publication_date"]=> string(10) "2024-03-19" ["categories"]=> array(4) { [0]=> string(17) "Energy Management" [1]=> string(18) "Expansion & Growth" [2]=> string(20) "Alternative Energies" [3]=> string(6) "Energy" } } [3]=> array(7) { ["title_en"]=> string(107) "TenneT opens temporary information container about connecting wind farms to Velsen beach | Wind Energy News" ["snippet_en"]=> string(261) "Grid operator TenneT opened a temporary information point on Velsen beach last Thursday. Here visitors can find out more about the activities involved in the connection of offshore wind farms to land, in this case the Hollandse Kust (west Beta) grid connection." ["url"]=> string(116) "https://windenergie-nieuws.nl/16/tennet-opent-tijdelijke-infocontainer-over-aansluiting-windparken-op-strand-velsen/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/6c562663-ab4e-47ca-97d3-64e5701a9bc1" ["source"]=> string(21) "windenergie-nieuws.nl" ["publication_date"]=> string(10) "2024-03-16" ["categories"]=> array(4) { [0]=> string(17) "Energy Management" [1]=> string(18) "Expansion & Growth" [2]=> string(20) "Alternative Energies" [3]=> string(6) "Energy" } } [4]=> array(7) { ["title_en"]=> string(66) "Happy with the weekly energy weather report on RTL4 - Regio Online" ["snippet_en"]=> string(169) "From March 8, RTL4 will broadcast a weekly energy weather report. This provides information about the yield of solar panels and wind turbines and the best time to use it" ["url"]=> string(61) "https://regioonline.nl/binnenland/blij-metenergieweerbericht/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/e94f4c81-23ae-4f53-bede-021a06419844" ["source"]=> string(14) "regioonline.nl" ["publication_date"]=> string(10) "2024-03-08" ["categories"]=> array(5) { [0]=> string(17) "Energy Management" [1]=> string(22) "Sustainable Investment" [2]=> string(20) "Alternative Energies" [3]=> string(19) "Green & Responsible" [4]=> string(6) "Energy" } } [5]=> array(7) { ["title_en"]=> string(68) "Rental pumps suitable for bentonite increase flexibility • Pomp NL" ["snippet_en"]=> string(170) "The number of cable and pipeline projects is growing with the increasing demand surrounding the energy transition. At Heijmans Infra Energie, Wesley van Heeswijk arranges" ["url"]=> string(88) "https://www.pompnl.nl/native/voor-bentoniet-geschikte-huurpompen-verhogen-flexibiliteit/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/e4cd92c2-3b72-43ef-8477-3a6dd7305391" ["source"]=> string(9) "pompnl.nl" ["publication_date"]=> string(10) "2024-02-28" ["categories"]=> array(4) { [0]=> string(17) "Energy Management" [1]=> string(13) "Collaboration" [2]=> string(20) "Alternative Energies" [3]=> string(6) "Energy" } } [6]=> array(7) { ["title_en"]=> string(94) "Planning approval for German high voltage power line accelerated thanks to reduced bureaucracy" ["snippet_en"]=> string(96) "The Clean Energy Wire produces and enables first-class journalism about the energy transition in" ["url"]=> string(124) "https://www.cleanenergywire.org/news/planning-approval-german-high-voltage-power-line-accelerated-thanks-reduced-bureaucracy" ["image_url"]=> NULL ["source"]=> string(19) "cleanenergywire.org" ["publication_date"]=> string(10) "2024-02-27" ["categories"]=> array(6) { [0]=> string(6) "Energy" [1]=> string(17) "Energy Management" [2]=> string(22) "Sustainable Investment" [3]=> string(20) "Alternative Energies" [4]=> string(19) "Green & Responsible" [5]=> string(13) "GHG Emissions" } } [7]=> array(7) { ["title_en"]=> string(43) "Network expansion for the energy transition" ["snippet_en"]=> string(273) "The prerequisite for the energy transition is to transport wind power from north to south. In order for this to be successful, not only above-ground power lines are needed, but also many kilometers of underground cables that are installed in a cable protection pipe system." ["url"]=> string(53) "https://baublatt.de/netzausbau-fuer-die-energiewende/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/46b40996-8485-446a-a758-684c289e5efe" ["source"]=> string(11) "baublatt.de" ["publication_date"]=> string(10) "2024-02-08" ["categories"]=> array(5) { [0]=> string(18) "Expansion & Growth" [1]=> string(17) "Energy Management" [2]=> string(20) "Alternative Energies" [3]=> string(13) "GHG Emissions" [4]=> string(6) "Energy" } } [8]=> array(7) { ["title_en"]=> string(68) "Grid congestion reducing German North Sea wind production – Tennet" ["snippet_en"]=> string(132) "Read Grid congestion reducing German North Sea wind production – Tennet and other wind energy news & analysis on Windpower Monthly" ["url"]=> string(117) "https://www.windpowermonthly.com/article/1860641/grid-congestion-reducing-german-north-sea-wind-production-–-tennet" ["image_url"]=> string(78) "https://images.businessradar.com/articles/54d2c127-f2f3-47f5-ac9c-07a76077ccdb" ["source"]=> string(20) "windpowermonthly.com" ["publication_date"]=> string(10) "2024-02-07" ["categories"]=> array(7) { [0]=> string(18) "Expansion & Growth" [1]=> string(17) "Production Issues" [2]=> string(17) "Energy Management" [3]=> string(18) "Ecological Impacts" [4]=> string(20) "Alternative Energies" [5]=> string(13) "GHG Emissions" [6]=> string(6) "Energy" } } } ["category_annotations"]=> array(30) { [0]=> array(2) { ["name"]=> string(17) "Energy Management" ["count"]=> int(948) } [1]=> array(2) { ["name"]=> string(19) "Green & Responsible" ["count"]=> int(396) } [2]=> array(2) { ["name"]=> string(20) "Alternative Energies" ["count"]=> int(346) } [3]=> array(2) { ["name"]=> string(6) "Energy" ["count"]=> int(296) } [4]=> array(2) { ["name"]=> string(18) "Expansion & Growth" ["count"]=> int(260) } [5]=> array(2) { ["name"]=> string(15) "Deals & Tenders" ["count"]=> int(254) } [6]=> array(2) { ["name"]=> string(6) "Outage" ["count"]=> int(177) } [7]=> array(2) { ["name"]=> string(13) "Collaboration" ["count"]=> int(147) } [8]=> array(2) { ["name"]=> string(18) "General Investment" ["count"]=> int(145) } [9]=> array(2) { ["name"]=> string(5) "Legal" ["count"]=> int(93) } [10]=> array(2) { ["name"]=> string(13) "GHG Emissions" ["count"]=> int(92) } [11]=> array(2) { ["name"]=> string(5) "Award" ["count"]=> int(91) } [12]=> array(2) { ["name"]=> string(18) "Ecological Impacts" ["count"]=> int(76) } [13]=> array(2) { ["name"]=> string(11) "Acquisition" ["count"]=> int(71) } [14]=> array(2) { ["name"]=> string(8) "Politics" ["count"]=> int(64) } [15]=> array(2) { ["name"]=> string(14) "Product Launch" ["count"]=> int(58) } [16]=> array(2) { ["name"]=> string(19) "Investment Requests" ["count"]=> int(53) } [17]=> array(2) { ["name"]=> string(22) "Sustainable Investment" ["count"]=> int(49) } [18]=> array(2) { ["name"]=> string(5) "R & D" ["count"]=> int(48) } [19]=> array(2) { ["name"]=> string(24) "Quarterly/Annual Figures" ["count"]=> int(43) } [20]=> array(2) { ["name"]=> string(20) "Contract negotiation" ["count"]=> int(41) } [21]=> array(2) { ["name"]=> string(19) "Foreign Development" ["count"]=> int(40) } [22]=> array(2) { ["name"]=> string(33) "Materials Sourcing and Efficiency" ["count"]=> int(37) } [23]=> array(2) { ["name"]=> string(17) "Electric Vehicles" ["count"]=> int(37) } [24]=> array(2) { ["name"]=> string(19) "Government Policies" ["count"]=> int(37) } [25]=> array(2) { ["name"]=> string(24) "Government Interventions" ["count"]=> int(36) } [26]=> array(2) { ["name"]=> string(15) "Market Movement" ["count"]=> int(34) } [27]=> array(2) { ["name"]=> string(10) "Divestment" ["count"]=> int(32) } [28]=> array(2) { ["name"]=> string(34) "Physical Impacts of Climate Change" ["count"]=> int(25) } [29]=> array(2) { ["name"]=> string(12) "Board Change" ["count"]=> int(24) } } } 861a7-nl-tennet-tso-bv

TenneT TSO B.V.

Location

Founded

Website

https://www.tennet.eu

Articles

3240 Articles

Category

Electric Services

Description

TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future.

Articles

'Energy transition under pressure due to grid management tariffs and lack of industrial policy'

2024-03-26 (consultancy.nl)

'Energy transition under pressure due to grid management tariffs and lack of industrial policy'

Market prices for energy have fallen significantly compared to a year ago. However, high grid management rates threaten to set the Dutch green energy transition behind.

Read more
Always up to date with current green energy figures, thanks to the national dashboard | Change Inc.

2024-03-22 (change.inc)

Always up to date with current green energy figures, thanks to the national dashboard | Change Inc.

The National Energy Dashboard provides insight into the use and consumption of gas and electricity. The data is freely accessible.

Read more
CAT in the CCM network expansion project

2024-03-19 (bauforum24.biz)

CAT in the CCM network expansion project

The prerequisite for the energy transition is to transport wind power from north to south. In order for this to be successful, not only above-ground power lines are needed, but also many kilometers of underground cables that are installed in a cable protection pipe system. This is especially true for this

Read more
TenneT opens temporary information container about connecting wind farms to Velsen beach | Wind Energy News

2024-03-16 (windenergie-nieuws.nl)

TenneT opens temporary information container about connecting wind farms to Velsen beach | Wind Energy News

Grid operator TenneT opened a temporary information point on Velsen beach last Thursday. Here visitors can find out more about the activities involved in the connection of offshore wind farms to land, in this case the Hollandse Kust (west Beta) grid connection.

Read more
Happy with the weekly energy weather report on RTL4 - Regio Online

2024-03-08 (regioonline.nl)

Happy with the weekly energy weather report on RTL4 - Regio Online

From March 8, RTL4 will broadcast a weekly energy weather report. This provides information about the yield of solar panels and wind turbines and the best time to use it

Read more
Rental pumps suitable for bentonite increase flexibility • Pomp NL

2024-02-28 (pompnl.nl)

Rental pumps suitable for bentonite increase flexibility • Pomp NL

The number of cable and pipeline projects is growing with the increasing demand surrounding the energy transition. At Heijmans Infra Energie, Wesley van Heeswijk arranges

Read more
Planning approval for German high voltage power line accelerated thanks to reduced bureaucracy

2024-02-27 (cleanenergywire.org)

Planning approval for German high voltage power line accelerated thanks to reduced bureaucracy

The Clean Energy Wire produces and enables first-class journalism about the energy transition in

Read more
Network expansion for the energy transition

2024-02-08 (baublatt.de)

Network expansion for the energy transition

The prerequisite for the energy transition is to transport wind power from north to south. In order for this to be successful, not only above-ground power lines are needed, but also many kilometers of underground cables that are installed in a cable protection pipe system.

Read more
Grid congestion reducing German North Sea wind production – Tennet

2024-02-07 (windpowermonthly.com)

Grid congestion reducing German North Sea wind production – Tennet

Read Grid congestion reducing German North Sea wind production – Tennet and other wind energy news & analysis on Windpower Monthly

Read more

Newsletter subscription