array(3) { ["company_details"]=> array(13) { ["name"]=> string(15) "TenneT TSO B.V." ["slug"]=> string(22) "861a7-nl-tennet-tso-bv" ["logo"]=> string(84) "https://images.businessradar.com/linkedin_logos/5a366392-afaa-46a3-89e7-f21fd7c71def" ["description"]=> string(1278) "TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future." ["address_street"]=> string(20) "Utrechtseweg 310 M01" ["address_place"]=> string(6) "Arnhem" ["address_region"]=> NULL ["founding_date"]=> NULL ["website_domain"]=> string(9) "tennet.eu" ["website_url"]=> string(21) "https://www.tennet.eu" ["industry_codes"]=> array(1) { [0]=> string(17) "Electric Services" } ["employee_count"]=> int(1191) ["article_count"]=> int(3240) } ["articles"]=> array(9) { [0]=> array(7) { ["title_en"]=> string(80) "The German transmission system operator is increasing investments in the network" ["snippet_en"]=> string(108) "Better connections are needed to transmit electricity generated from wind and solar power across the country" ["url"]=> string(125) "https://www.energetika-net.com/energetsko-gospodarstvo/njemacki-operator-elektroprijenosnog-sustava-povecava-ulaganja-u-mrezu" ["image_url"]=> string(78) "https://images.businessradar.com/articles/b3189239-1bd3-4c37-9ea1-e4a9e7d1578a" ["source"]=> string(18) "energetika-net.com" ["publication_date"]=> string(10) "2024-04-12" ["categories"]=> array(4) { [0]=> string(17) "Energy Management" [1]=> string(6) "Energy" [2]=> string(34) "Physical Impacts of Climate Change" [3]=> string(19) "Foreign Development" } } [1]=> array(7) { ["title_en"]=> string(138) "Arnhem energy front Alliander, Dekra, DNV, KEMA Labs, and TenneT join forces as partners of Arnhem Electricity Week - Cyprus Shipping News" ["snippet_en"]=> string(298) "Alliander, DEKRA, DNV, KEMA Labs, and TenneT are joining forces as partners of Arnhem Electricity Week. As leading players in the energy industry, these organizations support the initiative of Arnhem Electricity Week and collaborate to promote sustainable energy solutions and attract talent to the" ["url"]=> string(154) "https://cyprusshippingnews.com/2024/04/10/arnhem-energy-front-alliander-dekra-dnv-kema-labs-and-tennet-join-forces-as-partners-of-arnhem-electricity-week/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/193c98d5-fdfc-40f3-b4c2-cc55f3be9f01" ["source"]=> string(22) "cyprusshippingnews.com" ["publication_date"]=> string(10) "2024-04-08" ["categories"]=> array(4) { [0]=> string(17) "Energy Management" [1]=> string(22) "Sustainable Investment" [2]=> string(6) "Energy" [3]=> string(13) "Collaboration" } } [2]=> array(7) { ["title_en"]=> string(79) "The province of Utrecht is turning back to gas due to an overcrowded power grid" ["snippet_en"]=> string(195) "In the province of Utrecht, hybrid heat pumps, CHPs and gas power stations will be needed in the coming years to spare the power grid. Charging stations must also be turned off during peak hours." ["url"]=> string(96) "https://nos.nl/artikel/2518115-provincie-utrecht-grijpt-terug-naar-gas-vanwege-overvol-stroomnet" ["image_url"]=> string(78) "https://images.businessradar.com/articles/cdf34972-9764-4089-9196-734a46b07eba" ["source"]=> string(6) "nos.nl" ["publication_date"]=> string(10) "2024-04-02" ["categories"]=> array(2) { [0]=> string(17) "Energy Management" [1]=> string(6) "Energy" } } [3]=> array(7) { ["title_en"]=> string(60) "Stedin and Tennet designate places to relieve the power grid" ["snippet_en"]=> string(281) "With the construction of a new high-voltage station and the expansion of existing stations, grid operators Tennet and Stedin hope to expand the overcrowded energy network in the province of Utrecht. The companies have designated a number of places in the province for this purpose." ["url"]=> string(88) "https://www.pen.nl/artikel/stedin-en-tennet-wijzen-plekken-aan-om-stroomnet-te-ontlasten" ["image_url"]=> string(78) "https://images.businessradar.com/articles/07ca2083-de2b-4375-a9b5-c4368158ce6c" ["source"]=> string(6) "pen.nl" ["publication_date"]=> string(10) "2024-04-01" ["categories"]=> array(3) { [0]=> string(17) "Energy Management" [1]=> string(18) "Expansion & Growth" [2]=> string(6) "Energy" } } [4]=> array(7) { ["title_en"]=> string(95) "'Energy transition under pressure due to grid management tariffs and lack of industrial policy'" ["snippet_en"]=> string(168) "Market prices for energy have fallen significantly compared to a year ago. However, high grid management rates threaten to set the Dutch green energy transition behind." ["url"]=> string(122) "https://www.consultancy.nl/nieuws/52473/energietransitie-onder-druk-door-netbeheertarieven-en-gebrek-aan-industriepolitiek" ["image_url"]=> string(78) "https://images.businessradar.com/articles/a00b5e7a-a8c0-47e1-97b5-2468b0551880" ["source"]=> string(14) "consultancy.nl" ["publication_date"]=> string(10) "2024-03-26" ["categories"]=> array(5) { [0]=> string(46) "Management of Legal and Regulatory Environment" [1]=> string(18) "Ecological Impacts" [2]=> string(17) "Energy Management" [3]=> string(6) "Energy" [4]=> string(20) "Alternative Energies" } } [5]=> array(7) { ["title_en"]=> string(99) "Always up to date with current green energy figures, thanks to the national dashboard | Change Inc." ["snippet_en"]=> string(130) "The National Energy Dashboard provides insight into the use and consumption of gas and electricity. The data is freely accessible." ["url"]=> string(115) "https://www.change.inc/energie/hoeveel-duurzame-stroom-gebruikt-nederland-op-dit-moment-deze-website-weet-het-40887" ["image_url"]=> string(78) "https://images.businessradar.com/articles/264ab7a1-663b-4256-bfec-3913618d4b58" ["source"]=> string(10) "change.inc" ["publication_date"]=> string(10) "2024-03-22" ["categories"]=> array(3) { [0]=> string(17) "Energy Management" [1]=> string(6) "Energy" [2]=> string(20) "Alternative Energies" } } [6]=> array(7) { ["title_en"]=> string(93) "Solar panels produced 21,393 gigawatt hours of electricity last year, Brabant leading the way" ["snippet_en"]=> string(211) "Solar panels produced 21,393 gigawatt hours of electricity in the Netherlands last year. The most solar energy was generated in North Brabant: 3,819 gigawatts. Flevoland is at the bottom with 797 gigawatt hours." ["url"]=> string(132) "https://solarmagazine.nl/nieuws-zonne-energie/i36992/zonnepanelen-produceerden-vorig-jaar-21-393-gigawattuur-stroom-brabant-koploper" ["image_url"]=> string(78) "https://images.businessradar.com/articles/c9f2aca8-8c99-4d1d-9380-ee098ebd5be2" ["source"]=> string(16) "solarmagazine.nl" ["publication_date"]=> string(10) "2024-03-22" ["categories"]=> array(3) { [0]=> string(17) "Energy Management" [1]=> string(6) "Energy" [2]=> string(19) "Green & Responsible" } } [7]=> array(7) { ["title_en"]=> string(59) "North Sea oil and gas, wind platforms line up at Aibel yard" ["snippet_en"]=> string(96) "Aibel is working on three North Sea platforms at its yard in Haugesund on Norway’s west coast." ["url"]=> string(142) "https://www.offshore-mag.com/business-briefs/equipment-engineering/article/14310608/north-sea-oil-and-gas-wind-platforms-line-up-at-aibel-yard" ["image_url"]=> string(78) "https://images.businessradar.com/articles/b5e1e8e9-1aa7-4b21-abb2-eab90b093a72" ["source"]=> string(16) "offshore-mag.com" ["publication_date"]=> string(10) "2024-03-21" ["categories"]=> array(1) { [0]=> string(6) "Energy" } } [8]=> array(7) { ["title_en"]=> string(61) "Opportunities for digital twin with national energy dashboard" ["snippet_en"]=> string(126) "Gasunie and Tennet today launched the National Energy Dashboard, with national online data on electricity and gas consumption." ["url"]=> string(95) "https://www.stadszaken.nl/artikel/5793/kansen-voor-digital-twin-met-landelijk-energie-dashboard" ["image_url"]=> string(78) "https://images.businessradar.com/articles/9a26a256-240d-4e1a-8cd4-4917e8fb63fc" ["source"]=> string(13) "stadszaken.nl" ["publication_date"]=> string(10) "2024-03-21" ["categories"]=> array(2) { [0]=> string(17) "Energy Management" [1]=> string(6) "Energy" } } } ["category_annotations"]=> array(30) { [0]=> array(2) { ["name"]=> string(17) "Energy Management" ["count"]=> int(948) } [1]=> array(2) { ["name"]=> string(19) "Green & Responsible" ["count"]=> int(396) } [2]=> array(2) { ["name"]=> string(20) "Alternative Energies" ["count"]=> int(346) } [3]=> array(2) { ["name"]=> string(6) "Energy" ["count"]=> int(296) } [4]=> array(2) { ["name"]=> string(18) "Expansion & Growth" ["count"]=> int(260) } [5]=> array(2) { ["name"]=> string(15) "Deals & Tenders" ["count"]=> int(254) } [6]=> array(2) { ["name"]=> string(6) "Outage" ["count"]=> int(177) } [7]=> array(2) { ["name"]=> string(13) "Collaboration" ["count"]=> int(147) } [8]=> array(2) { ["name"]=> string(18) "General Investment" ["count"]=> int(145) } [9]=> array(2) { ["name"]=> string(5) "Legal" ["count"]=> int(93) } [10]=> array(2) { ["name"]=> string(13) "GHG Emissions" ["count"]=> int(92) } [11]=> array(2) { ["name"]=> string(5) "Award" ["count"]=> int(91) } [12]=> array(2) { ["name"]=> string(18) "Ecological Impacts" ["count"]=> int(76) } [13]=> array(2) { ["name"]=> string(11) "Acquisition" ["count"]=> int(71) } [14]=> array(2) { ["name"]=> string(8) "Politics" ["count"]=> int(64) } [15]=> array(2) { ["name"]=> string(14) "Product Launch" ["count"]=> int(58) } [16]=> array(2) { ["name"]=> string(19) "Investment Requests" ["count"]=> int(53) } [17]=> array(2) { ["name"]=> string(22) "Sustainable Investment" ["count"]=> int(49) } [18]=> array(2) { ["name"]=> string(5) "R & D" ["count"]=> int(48) } [19]=> array(2) { ["name"]=> string(24) "Quarterly/Annual Figures" ["count"]=> int(43) } [20]=> array(2) { ["name"]=> string(20) "Contract negotiation" ["count"]=> int(41) } [21]=> array(2) { ["name"]=> string(19) "Foreign Development" ["count"]=> int(40) } [22]=> array(2) { ["name"]=> string(33) "Materials Sourcing and Efficiency" ["count"]=> int(37) } [23]=> array(2) { ["name"]=> string(17) "Electric Vehicles" ["count"]=> int(37) } [24]=> array(2) { ["name"]=> string(19) "Government Policies" ["count"]=> int(37) } [25]=> array(2) { ["name"]=> string(24) "Government Interventions" ["count"]=> int(36) } [26]=> array(2) { ["name"]=> string(15) "Market Movement" ["count"]=> int(34) } [27]=> array(2) { ["name"]=> string(10) "Divestment" ["count"]=> int(32) } [28]=> array(2) { ["name"]=> string(34) "Physical Impacts of Climate Change" ["count"]=> int(25) } [29]=> array(2) { ["name"]=> string(12) "Board Change" ["count"]=> int(24) } } } 861a7-nl-tennet-tso-bv

TenneT TSO B.V.

Location

Founded

Website

https://www.tennet.eu

Articles

3240 Articles

Category

Electric Services

Description

TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future.

Articles

The German transmission system operator is increasing investments in the network

2024-04-12 (energetika-net.com)

The German transmission system operator is increasing investments in the network

Better connections are needed to transmit electricity generated from wind and solar power across the country

Read more
Arnhem energy front Alliander, Dekra, DNV, KEMA Labs, and TenneT join forces as partners of Arnhem Electricity Week - Cyprus Shipping News

2024-04-08 (cyprusshippingnews.com)

Arnhem energy front Alliander, Dekra, DNV, KEMA Labs, and TenneT join forces as partners of Arnhem Electricity Week - Cyprus Shipping News

Alliander, DEKRA, DNV, KEMA Labs, and TenneT are joining forces as partners of Arnhem Electricity Week. As leading players in the energy industry, these organizations support the initiative of Arnhem Electricity Week and collaborate to promote sustainable energy solutions and attract talent to the

Read more
The province of Utrecht is turning back to gas due to an overcrowded power grid

2024-04-02 (nos.nl)

The province of Utrecht is turning back to gas due to an overcrowded power grid

In the province of Utrecht, hybrid heat pumps, CHPs and gas power stations will be needed in the coming years to spare the power grid. Charging stations must also be turned off during peak hours.

Read more
Stedin and Tennet designate places to relieve the power grid

2024-04-01 (pen.nl)

Stedin and Tennet designate places to relieve the power grid

With the construction of a new high-voltage station and the expansion of existing stations, grid operators Tennet and Stedin hope to expand the overcrowded energy network in the province of Utrecht. The companies have designated a number of places in the province for this purpose.

Read more
'Energy transition under pressure due to grid management tariffs and lack of industrial policy'

2024-03-26 (consultancy.nl)

'Energy transition under pressure due to grid management tariffs and lack of industrial policy'

Market prices for energy have fallen significantly compared to a year ago. However, high grid management rates threaten to set the Dutch green energy transition behind.

Read more
Always up to date with current green energy figures, thanks to the national dashboard | Change Inc.

2024-03-22 (change.inc)

Always up to date with current green energy figures, thanks to the national dashboard | Change Inc.

The National Energy Dashboard provides insight into the use and consumption of gas and electricity. The data is freely accessible.

Read more
Solar panels produced 21,393 gigawatt hours of electricity last year, Brabant leading the way

2024-03-22 (solarmagazine.nl)

Solar panels produced 21,393 gigawatt hours of electricity last year, Brabant leading the way

Solar panels produced 21,393 gigawatt hours of electricity in the Netherlands last year. The most solar energy was generated in North Brabant: 3,819 gigawatts. Flevoland is at the bottom with 797 gigawatt hours.

Read more
North Sea oil and gas, wind platforms line up at Aibel yard

2024-03-21 (offshore-mag.com)

North Sea oil and gas, wind platforms line up at Aibel yard

Aibel is working on three North Sea platforms at its yard in Haugesund on Norway’s west coast.

Read more
Opportunities for digital twin with national energy dashboard

2024-03-21 (stadszaken.nl)

Opportunities for digital twin with national energy dashboard

Gasunie and Tennet today launched the National Energy Dashboard, with national online data on electricity and gas consumption.

Read more

Newsletter subscription