array(3) { ["company_details"]=> array(13) { ["name"]=> string(15) "TenneT TSO B.V." ["slug"]=> string(22) "861a7-nl-tennet-tso-bv" ["logo"]=> string(84) "https://images.businessradar.com/linkedin_logos/5a366392-afaa-46a3-89e7-f21fd7c71def" ["description"]=> string(1278) "TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future." ["address_street"]=> string(20) "Utrechtseweg 310 M01" ["address_place"]=> string(6) "Arnhem" ["address_region"]=> NULL ["founding_date"]=> NULL ["website_domain"]=> string(9) "tennet.eu" ["website_url"]=> string(21) "https://www.tennet.eu" ["industry_codes"]=> array(1) { [0]=> string(17) "Electric Services" } ["employee_count"]=> int(1191) ["article_count"]=> int(3240) } ["articles"]=> array(9) { [0]=> array(7) { ["title_en"]=> string(109) "TenneT Receives $27.22 Billion Loan From Dutch State For 2024/2025 Investments In The Netherlands and Germany" ["snippet_en"]=> string(90) "TenneT expects to invest more than $10.89 billion in electricity grid expansion each year." ["url"]=> string(173) "https://www.tdworld.com/transmission-reliability/article/21281063/tennet-receives-2722-billion-loan-from-dutch-state-for-2024-2025-investments-in-the-netherlands-and-germany" ["image_url"]=> string(78) "https://images.businessradar.com/articles/5cf1fc2a-ec6e-4e02-bfa3-18c96a9f2aab" ["source"]=> string(11) "tdworld.com" ["publication_date"]=> string(10) "2024-01-19" ["categories"]=> array(9) { [0]=> string(24) "Government Interventions" [1]=> string(19) "Foreign Development" [2]=> string(14) "Government Aid" [3]=> string(17) "Energy Management" [4]=> string(18) "Expansion & Growth" [5]=> string(25) "Business Model Resilience" [6]=> string(22) "Financing Arrangements" [7]=> string(18) "General Investment" [8]=> string(19) "Investment Requests" } } [1]=> array(7) { ["title_en"]=> string(48) "Stedin installs new transformers in Middelharnis" ["snippet_en"]=> string(295) "GOEREE-OVERFLAKKEE - Grid operator Stedin has expanded the capacity of the Middelharnis high-voltage station at Goeree-Overflakkee with an investment of 7.5 million euros. “By installing two large transformers, a total of 35 megawatts extra has been added in the past period, according to plan" ["url"]=> string(111) "https://www.eilandennieuws.nl/algemeen/algemeen/17446/stedin-installeert-nieuwe-transformatoren-in-middelharnis" ["image_url"]=> string(78) "https://images.businessradar.com/articles/f108b5e0-4082-4774-9a46-8a2b80f4e3e4" ["source"]=> string(17) "eilandennieuws.nl" ["publication_date"]=> string(10) "2023-11-17" ["categories"]=> array(5) { [0]=> string(6) "Energy" [1]=> string(33) "Critical Incident Risk Management" [2]=> string(18) "Expansion & Growth" [3]=> string(6) "Outage" [4]=> string(18) "General Investment" } } [2]=> array(7) { ["title_en"]=> string(115) "Solar Magazine - Liander reports record investment of 4 billion euros, but a quarter of the work remains unfinished" ["snippet_en"]=> string(207) "Liander will invest more than 4 billion euros in the expansion of the power grid and its other infrastructure in the period 2024-2026. Despite the record investment, a quarter of the work remains unfinished." ["url"]=> string(133) "https://solarmagazine.nl/nieuws-zonne-energie/i35721/liander-meldt-recordinvestering-van-4-miljard-euro-maar-kwart-werk-blijft-liggen" ["image_url"]=> string(78) "https://images.businessradar.com/articles/0b74cdd3-e61f-47e0-8814-2632b12250b5" ["source"]=> string(16) "solarmagazine.nl" ["publication_date"]=> string(10) "2023-11-02" ["categories"]=> array(6) { [0]=> string(17) "Energy Management" [1]=> string(24) "Quarterly/Annual Figures" [2]=> string(25) "Business Model Resilience" [3]=> string(13) "Collaboration" [4]=> string(18) "General Investment" [5]=> string(19) "Investment Requests" } } [3]=> array(7) { ["title_en"]=> string(88) "Liander is investing 1.2 billion euros in Gelderland, but acceleration remains necessary" ["snippet_en"]=> string(89) "Today, grid operator Liander presents its most ambitious investment plan ever. Not before" ["url"]=> string(106) "https://loemedia.nl/liander-investeert-12-miljard-euro-in-gelderland-maar-versnelling-blijft-noodzakelijk/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/a1b11ede-f373-425a-81c3-3339144fedec" ["source"]=> string(11) "loemedia.nl" ["publication_date"]=> string(10) "2023-11-02" ["categories"]=> array(7) { [0]=> string(6) "Energy" [1]=> string(17) "Energy Management" [2]=> string(18) "Expansion & Growth" [3]=> string(25) "Business Model Resilience" [4]=> string(19) "Investment Requests" [5]=> string(18) "General Investment" [6]=> string(13) "Collaboration" } } [4]=> array(7) { ["title_en"]=> string(50) "Grid operator TenneT expects investments to double" ["snippet_en"]=> string(94) "High-voltage grid operator TenneT is doubling its investment plans for the next ten years. The" ["url"]=> string(93) "https://www.nd.nl/varia/varia/1198577/netbeheerder-tennet-verwacht-verdubbeling-investeringen" ["image_url"]=> string(78) "https://images.businessradar.com/articles/a0d2bf94-f265-49d2-bba3-51fdc0e39065" ["source"]=> string(5) "nd.nl" ["publication_date"]=> string(10) "2023-11-02" ["categories"]=> array(3) { [0]=> string(18) "General Investment" [1]=> string(19) "Investment Requests" [2]=> string(17) "Energy Management" } } [5]=> array(7) { ["title_en"]=> string(80) "Liander presents a record plan for Flevoland, but acceleration remains necessary" ["snippet_en"]=> string(275) "Today, grid operator Liander presents its most ambitious investment plan ever. Never before has so much been invested in, among other things, expanding and maintaining the electricity and gas networks. In Flevoland, this amounts to 244 million euros for the next three years." ["url"]=> string(126) "https://flevopost.nl/lelystad/Liander-presenteert-recordplan-voor-Flevoland-maar-versnelling-blijft-noodzakelijk-28725731.html" ["image_url"]=> string(78) "https://images.businessradar.com/articles/24c2c1ed-c959-490a-b855-96a33dabdfcb" ["source"]=> string(12) "flevopost.nl" ["publication_date"]=> string(10) "2023-11-01" ["categories"]=> array(3) { [0]=> string(18) "General Investment" [1]=> string(18) "Expansion & Growth" [2]=> string(17) "Energy Management" } } [6]=> array(7) { ["title_en"]=> string(61) "Neara: Growth financing for AI-based power network resilience" ["snippet_en"]=> string(137) "This week’s Smart Energy Finances looks at an investment round for Neara, a platform to help utility operators design networks with AI." ["url"]=> string(153) "https://www.smart-energy.com/industry-sectors/finance-investment-industry-sectors/smart-energy-finances-growth-financing-for-ai-based-network-resilience/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/564f722a-536b-444e-bbc8-46a0e8e90b10" ["source"]=> string(16) "smart-energy.com" ["publication_date"]=> string(10) "2023-09-29" ["categories"]=> array(3) { [0]=> string(18) "General Investment" [1]=> string(18) "Expansion & Growth" [2]=> string(31) "Water and Wastewater Management" } } [7]=> array(7) { ["title_en"]=> string(65) "Climate plans of Dow and Yara at risk due to electricity shortage" ["snippet_en"]=> string(176) "Dow and Yara are known as major industrial polluters. The companies in Zeeuws-Vlaanderen are ready to invest in more climate-friendly production. Only: there is no electricity." ["url"]=> string(115) "https://www.omroepzeeland.nl/nieuws/15839528/klimaatplannen-van-dow-en-yara-in-gevaar-door-tekort-aan-elektriciteit" ["image_url"]=> string(78) "https://images.businessradar.com/articles/5b3c9be0-3073-4aec-a988-8dbc41473ab5" ["source"]=> string(16) "omroepzeeland.nl" ["publication_date"]=> string(10) "2023-09-21" ["categories"]=> array(2) { [0]=> string(19) "Green & Responsible" [1]=> string(18) "General Investment" } } [8]=> array(7) { ["title_en"]=> string(63) "TenneT concludes a mega contract to make room on the power grid" ["snippet_en"]=> string(85) "With an investment of 1.5 billion euros, three projects in Zeeland are made possible." ["url"]=> string(109) "https://www.omroepzeeland.nl/nieuws/15790235/tennet-sluit-megacontract-af-om-ruimte-te-maken-op-het-stroomnet" ["image_url"]=> string(78) "https://images.businessradar.com/articles/8ede2d6a-0bf7-4575-a9c1-d7e7a495faa4" ["source"]=> string(16) "omroepzeeland.nl" ["publication_date"]=> string(10) "2023-08-10" ["categories"]=> array(1) { [0]=> string(18) "General Investment" } } } ["category_annotations"]=> array(30) { [0]=> array(2) { ["name"]=> string(17) "Energy Management" ["count"]=> int(948) } [1]=> array(2) { ["name"]=> string(19) "Green & Responsible" ["count"]=> int(396) } [2]=> array(2) { ["name"]=> string(20) "Alternative Energies" ["count"]=> int(346) } [3]=> array(2) { ["name"]=> string(6) "Energy" ["count"]=> int(296) } [4]=> array(2) { ["name"]=> string(18) "Expansion & Growth" ["count"]=> int(260) } [5]=> array(2) { ["name"]=> string(15) "Deals & Tenders" ["count"]=> int(254) } [6]=> array(2) { ["name"]=> string(6) "Outage" ["count"]=> int(177) } [7]=> array(2) { ["name"]=> string(13) "Collaboration" ["count"]=> int(147) } [8]=> array(2) { ["name"]=> string(18) "General Investment" ["count"]=> int(145) } [9]=> array(2) { ["name"]=> string(5) "Legal" ["count"]=> int(93) } [10]=> array(2) { ["name"]=> string(13) "GHG Emissions" ["count"]=> int(92) } [11]=> array(2) { ["name"]=> string(5) "Award" ["count"]=> int(91) } [12]=> array(2) { ["name"]=> string(18) "Ecological Impacts" ["count"]=> int(76) } [13]=> array(2) { ["name"]=> string(11) "Acquisition" ["count"]=> int(71) } [14]=> array(2) { ["name"]=> string(8) "Politics" ["count"]=> int(64) } [15]=> array(2) { ["name"]=> string(14) "Product Launch" ["count"]=> int(58) } [16]=> array(2) { ["name"]=> string(19) "Investment Requests" ["count"]=> int(53) } [17]=> array(2) { ["name"]=> string(22) "Sustainable Investment" ["count"]=> int(49) } [18]=> array(2) { ["name"]=> string(5) "R & D" ["count"]=> int(48) } [19]=> array(2) { ["name"]=> string(24) "Quarterly/Annual Figures" ["count"]=> int(43) } [20]=> array(2) { ["name"]=> string(20) "Contract negotiation" ["count"]=> int(41) } [21]=> array(2) { ["name"]=> string(19) "Foreign Development" ["count"]=> int(40) } [22]=> array(2) { ["name"]=> string(33) "Materials Sourcing and Efficiency" ["count"]=> int(37) } [23]=> array(2) { ["name"]=> string(17) "Electric Vehicles" ["count"]=> int(37) } [24]=> array(2) { ["name"]=> string(19) "Government Policies" ["count"]=> int(37) } [25]=> array(2) { ["name"]=> string(24) "Government Interventions" ["count"]=> int(36) } [26]=> array(2) { ["name"]=> string(15) "Market Movement" ["count"]=> int(34) } [27]=> array(2) { ["name"]=> string(10) "Divestment" ["count"]=> int(32) } [28]=> array(2) { ["name"]=> string(34) "Physical Impacts of Climate Change" ["count"]=> int(25) } [29]=> array(2) { ["name"]=> string(12) "Board Change" ["count"]=> int(24) } } } 861a7-nl-tennet-tso-bv

TenneT TSO B.V.

Location

Founded

Website

https://www.tennet.eu

Articles

3240 Articles

Category

Electric Services

Description

TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future.

Articles

TenneT Receives $27.22 Billion Loan From Dutch State For 2024/2025 Investments In The Netherlands and Germany

2024-01-19 (tdworld.com)

TenneT Receives $27.22 Billion Loan From Dutch State For 2024/2025 Investments In The Netherlands and Germany

TenneT expects to invest more than $10.89 billion in electricity grid expansion each year.

Read more
Stedin installs new transformers in Middelharnis

2023-11-17 (eilandennieuws.nl)

Stedin installs new transformers in Middelharnis

GOEREE-OVERFLAKKEE - Grid operator Stedin has expanded the capacity of the Middelharnis high-voltage station at Goeree-Overflakkee with an investment of 7.5 million euros. “By installing two large transformers, a total of 35 megawatts extra has been added in the past period, according to plan

Read more
Solar Magazine - Liander reports record investment of 4 billion euros, but a quarter of the work remains unfinished

2023-11-02 (solarmagazine.nl)

Solar Magazine - Liander reports record investment of 4 billion euros, but a quarter of the work remains unfinished

Liander will invest more than 4 billion euros in the expansion of the power grid and its other infrastructure in the period 2024-2026. Despite the record investment, a quarter of the work remains unfinished.

Read more
Liander is investing 1.2 billion euros in Gelderland, but acceleration remains necessary

2023-11-02 (loemedia.nl)

Liander is investing 1.2 billion euros in Gelderland, but acceleration remains necessary

Today, grid operator Liander presents its most ambitious investment plan ever. Not before

Read more
Grid operator TenneT expects investments to double

2023-11-02 (nd.nl)

Grid operator TenneT expects investments to double

High-voltage grid operator TenneT is doubling its investment plans for the next ten years. The

Read more
Liander presents a record plan for Flevoland, but acceleration remains necessary

2023-11-01 (flevopost.nl)

Liander presents a record plan for Flevoland, but acceleration remains necessary

Today, grid operator Liander presents its most ambitious investment plan ever. Never before has so much been invested in, among other things, expanding and maintaining the electricity and gas networks. In Flevoland, this amounts to 244 million euros for the next three years.

Read more
Neara: Growth financing for AI-based power network resilience

2023-09-29 (smart-energy.com)

Neara: Growth financing for AI-based power network resilience

This week’s Smart Energy Finances looks at an investment round for Neara, a platform to help utility operators design networks with AI.

Read more
Climate plans of Dow and Yara at risk due to electricity shortage

2023-09-21 (omroepzeeland.nl)

Climate plans of Dow and Yara at risk due to electricity shortage

Dow and Yara are known as major industrial polluters. The companies in Zeeuws-Vlaanderen are ready to invest in more climate-friendly production. Only: there is no electricity.

Read more
TenneT concludes a mega contract to make room on the power grid

2023-08-10 (omroepzeeland.nl)

TenneT concludes a mega contract to make room on the power grid

With an investment of 1.5 billion euros, three projects in Zeeland are made possible.

Read more

Newsletter subscription