array(3) {
["company_details"]=>
array(13) {
["name"]=>
string(15) "TenneT TSO B.V."
["slug"]=>
string(22) "861a7-nl-tennet-tso-bv"
["logo"]=>
string(84) "https://images.businessradar.com/linkedin_logos/5a366392-afaa-46a3-89e7-f21fd7c71def"
["description"]=>
string(1278) "TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future."
["address_street"]=>
string(20) "Utrechtseweg 310 M01"
["address_place"]=>
string(6) "Arnhem"
["address_region"]=>
NULL
["founding_date"]=>
NULL
["website_domain"]=>
string(9) "tennet.eu"
["website_url"]=>
string(21) "https://www.tennet.eu"
["industry_codes"]=>
array(1) {
[0]=>
string(17) "Electric Services"
}
["employee_count"]=>
int(1191)
["article_count"]=>
int(3240)
}
["articles"]=>
array(9) {
[0]=>
array(7) {
["title_en"]=>
string(93) "Solar panels produced 21,393 gigawatt hours of electricity last year, Brabant leading the way"
["snippet_en"]=>
string(211) "Solar panels produced 21,393 gigawatt hours of electricity in the Netherlands last year. The most solar energy was generated in North Brabant: 3,819 gigawatts. Flevoland is at the bottom with 797 gigawatt hours."
["url"]=>
string(132) "https://solarmagazine.nl/nieuws-zonne-energie/i36992/zonnepanelen-produceerden-vorig-jaar-21-393-gigawattuur-stroom-brabant-koploper"
["image_url"]=>
string(78) "https://images.businessradar.com/articles/c9f2aca8-8c99-4d1d-9380-ee098ebd5be2"
["source"]=>
string(16) "solarmagazine.nl"
["publication_date"]=>
string(10) "2024-03-22"
["categories"]=>
array(3) {
[0]=>
string(17) "Energy Management"
[1]=>
string(6) "Energy"
[2]=>
string(19) "Green & Responsible"
}
}
[1]=>
array(7) {
["title_en"]=>
string(24) "Tennet | Green Power Hub"
["snippet_en"]=>
string(96) "This special interest group is for professionals to connect and discuss all types of carbon-free"
["url"]=>
string(53) "https://energycentral.com/c/cp/tennet-green-power-hub"
["image_url"]=>
string(78) "https://images.businessradar.com/articles/f64154fa-1f5e-48af-a5f3-d1d9e61a2e70"
["source"]=>
string(17) "energycentral.com"
["publication_date"]=>
string(10) "2024-03-03"
["categories"]=>
array(3) {
[0]=>
string(17) "Energy Management"
[1]=>
string(6) "Energy"
[2]=>
string(19) "Green & Responsible"
}
}
[2]=>
array(7) {
["title_en"]=>
string(94) "Planning approval for German high voltage power line accelerated thanks to reduced bureaucracy"
["snippet_en"]=>
string(96) "The Clean Energy Wire produces and enables first-class journalism about the energy transition in"
["url"]=>
string(124) "https://www.cleanenergywire.org/news/planning-approval-german-high-voltage-power-line-accelerated-thanks-reduced-bureaucracy"
["image_url"]=>
NULL
["source"]=>
string(19) "cleanenergywire.org"
["publication_date"]=>
string(10) "2024-02-27"
["categories"]=>
array(6) {
[0]=>
string(17) "Energy Management"
[1]=>
string(6) "Energy"
[2]=>
string(20) "Alternative Energies"
[3]=>
string(19) "Green & Responsible"
[4]=>
string(22) "Sustainable Investment"
[5]=>
string(13) "GHG Emissions"
}
}
[3]=>
array(7) {
["title_en"]=>
string(50) "Climate mayor: 'Feed-in tax must be off the table'"
["snippet_en"]=>
string(269) "“The grid operators should be ashamed,” says Almere climate mayor Chris Soebroto. According to him, energy companies surprise customers who supply clean energy with extra costs. For example, a lower feed-in tariff or a higher price per kWh of electricity purchased."
["url"]=>
string(87) "https://www.1almere.nl/2024/02/22/klimaatburgemeester-terugleverheffing-moet-van-tafel/"
["image_url"]=>
string(78) "https://images.businessradar.com/articles/5499e361-9176-42e0-b7b6-8fcd1093889e"
["source"]=>
string(10) "1almere.nl"
["publication_date"]=>
string(10) "2024-02-22"
["categories"]=>
array(7) {
[0]=>
string(34) "Physical Impacts of Climate Change"
[1]=>
string(19) "Government Policies"
[2]=>
string(23) "Supply Chain Management"
[3]=>
string(17) "Energy Management"
[4]=>
string(6) "Energy"
[5]=>
string(19) "Green & Responsible"
[6]=>
string(13) "GHG Emissions"
}
}
[4]=>
array(7) {
["title_en"]=>
string(93) "TenneT - "Wind yield" in the Dutch and German North Sea generates more than 30 terawatt hours"
["snippet_en"]=>
string(143) "Electric Energy News Automation/IT | T&D | Climate Change | Generation | Hydroelectricity | Solar | Wind | Appointments | Financial | Oil & Gaz"
["url"]=>
string(162) "https://electricenergyonline.com/article/energy/category/wind/163/1062940/-wind-yield-in-the-dutch-and-german-north-sea-generates-more-than-30-terawatt-hours.html"
["image_url"]=>
NULL
["source"]=>
string(24) "electricenergyonline.com"
["publication_date"]=>
string(10) "2024-01-30"
["categories"]=>
array(13) {
[0]=>
string(29) "Environmental & Social Impact"
[1]=>
string(34) "Physical Impacts of Climate Change"
[2]=>
string(18) "Ecological Impacts"
[3]=>
string(19) "Government Policies"
[4]=>
string(17) "Energy Management"
[5]=>
string(6) "Energy"
[6]=>
string(20) "Alternative Energies"
[7]=>
string(24) "Systemic Risk Management"
[8]=>
string(8) "Activism"
[9]=>
string(17) "Electric Vehicles"
[10]=>
string(19) "Green & Responsible"
[11]=>
string(22) "Sustainable Investment"
[12]=>
string(13) "GHG Emissions"
}
}
[5]=>
array(7) {
["title_en"]=>
string(94) "Lack of grid capacity lets output of Germany’s North Sea offshore wind turbines drop in 2023"
["snippet_en"]=>
string(96) "The Clean Energy Wire produces and enables first-class journalism about the energy transition in"
["url"]=>
string(119) "https://www.cleanenergywire.org/news/lack-grid-capacity-lets-output-germanys-north-sea-offshore-wind-turbines-drop-2023"
["image_url"]=>
NULL
["source"]=>
string(19) "cleanenergywire.org"
["publication_date"]=>
string(10) "2024-01-29"
["categories"]=>
array(8) {
[0]=>
string(17) "Energy Management"
[1]=>
string(6) "Energy"
[2]=>
string(7) "Renewal"
[3]=>
string(18) "Expansion & Growth"
[4]=>
string(20) "Alternative Energies"
[5]=>
string(19) "Green & Responsible"
[6]=>
string(22) "Sustainable Investment"
[7]=>
string(13) "GHG Emissions"
}
}
[6]=>
array(7) {
["title_en"]=>
string(92) "TenneT - Environmentally friendly and cost-effective first in Wageningen for bird protection"
["snippet_en"]=>
string(143) "Electric Energy News Automation/IT | T&D | Climate Change | Generation | Hydroelectricity | Solar | Wind | Appointments | Financial | Oil & Gaz"
["url"]=>
string(160) "https://electricenergyonline.com/article/energy/category/t-d/56/1062408/environmentally-friendly-and-cost-effective-first-in-wageningen-for-bird-protection.html"
["image_url"]=>
NULL
["source"]=>
string(24) "electricenergyonline.com"
["publication_date"]=>
string(10) "2024-01-29"
["categories"]=>
array(11) {
[0]=>
string(29) "Environmental & Social Impact"
[1]=>
string(34) "Physical Impacts of Climate Change"
[2]=>
string(18) "Ecological Impacts"
[3]=>
string(17) "Energy Management"
[4]=>
string(6) "Energy"
[5]=>
string(20) "Alternative Energies"
[6]=>
string(24) "Systemic Risk Management"
[7]=>
string(17) "Electric Vehicles"
[8]=>
string(19) "Green & Responsible"
[9]=>
string(22) "Sustainable Investment"
[10]=>
string(13) "GHG Emissions"
}
}
[7]=>
array(7) {
["title_en"]=>
string(134) "TenneT and sunvigo start pilot project with households: Cooperation for more flexibility in bottleneck management | Wind Power Journal"
["snippet_en"]=>
string(308) "Transmission system operator TenneT and solar energy company sunvigo are testing how intelligently controlled solar roofs, storage and electric cars can reduce network bottlenecks. The potential is enormous: millions of networked PV systems and storage could potentially provide flexibility in the power grid"
["url"]=>
string(164) "https://www.windkraft-journal.de/2024/01/17/tennet-und-sunvigo-starten-pilotprojekt-mit-haushalten-kooperation-fuer-mehr-flexibilitaeten-im-engpassmanagement/196178"
["image_url"]=>
string(78) "https://images.businessradar.com/articles/9346b43a-6c31-4c04-927c-bdceeac81f5f"
["source"]=>
string(20) "windkraft-journal.de"
["publication_date"]=>
string(10) "2024-01-17"
["categories"]=>
array(10) {
[0]=>
string(17) "Energy Management"
[1]=>
string(6) "Energy"
[2]=>
string(20) "Alternative Energies"
[3]=>
string(18) "Expansion & Growth"
[4]=>
string(20) "Business Development"
[5]=>
string(17) "Electric Vehicles"
[6]=>
string(19) "Green & Responsible"
[7]=>
string(13) "Collaboration"
[8]=>
string(22) "Sustainable Investment"
[9]=>
string(13) "GHG Emissions"
}
}
[8]=>
array(7) {
["title_en"]=>
string(84) "In 2023 we would have almost four times as much green energy left over | Change Inc."
["snippet_en"]=>
string(182) "In 2023, 13 percent more green energy will be generated in the Netherlands than in 2022. Half of all electricity was green. In 2023, the electricity price was negative for 308 hours."
["url"]=>
string(91) "https://www.change.inc/energie/in-2023-hadden-we-vijf-keer-zo-vaak-groene-stroom-over-40686"
["image_url"]=>
string(78) "https://images.businessradar.com/articles/3d0a9815-76c0-43a4-8664-4912aad6b0d1"
["source"]=>
string(10) "change.inc"
["publication_date"]=>
string(10) "2024-01-02"
["categories"]=>
array(8) {
[0]=>
string(17) "Energy Management"
[1]=>
string(6) "Energy"
[2]=>
string(20) "Alternative Energies"
[3]=>
string(24) "Quarterly/Annual Figures"
[4]=>
string(19) "Green & Responsible"
[5]=>
string(13) "Collaboration"
[6]=>
string(22) "Sustainable Investment"
[7]=>
string(13) "GHG Emissions"
}
}
}
["category_annotations"]=>
array(30) {
[0]=>
array(2) {
["name"]=>
string(17) "Energy Management"
["count"]=>
int(948)
}
[1]=>
array(2) {
["name"]=>
string(19) "Green & Responsible"
["count"]=>
int(396)
}
[2]=>
array(2) {
["name"]=>
string(20) "Alternative Energies"
["count"]=>
int(346)
}
[3]=>
array(2) {
["name"]=>
string(6) "Energy"
["count"]=>
int(296)
}
[4]=>
array(2) {
["name"]=>
string(18) "Expansion & Growth"
["count"]=>
int(260)
}
[5]=>
array(2) {
["name"]=>
string(15) "Deals & Tenders"
["count"]=>
int(254)
}
[6]=>
array(2) {
["name"]=>
string(6) "Outage"
["count"]=>
int(177)
}
[7]=>
array(2) {
["name"]=>
string(13) "Collaboration"
["count"]=>
int(147)
}
[8]=>
array(2) {
["name"]=>
string(18) "General Investment"
["count"]=>
int(145)
}
[9]=>
array(2) {
["name"]=>
string(5) "Legal"
["count"]=>
int(93)
}
[10]=>
array(2) {
["name"]=>
string(13) "GHG Emissions"
["count"]=>
int(92)
}
[11]=>
array(2) {
["name"]=>
string(5) "Award"
["count"]=>
int(91)
}
[12]=>
array(2) {
["name"]=>
string(18) "Ecological Impacts"
["count"]=>
int(76)
}
[13]=>
array(2) {
["name"]=>
string(11) "Acquisition"
["count"]=>
int(71)
}
[14]=>
array(2) {
["name"]=>
string(8) "Politics"
["count"]=>
int(64)
}
[15]=>
array(2) {
["name"]=>
string(14) "Product Launch"
["count"]=>
int(58)
}
[16]=>
array(2) {
["name"]=>
string(19) "Investment Requests"
["count"]=>
int(53)
}
[17]=>
array(2) {
["name"]=>
string(22) "Sustainable Investment"
["count"]=>
int(49)
}
[18]=>
array(2) {
["name"]=>
string(5) "R & D"
["count"]=>
int(48)
}
[19]=>
array(2) {
["name"]=>
string(24) "Quarterly/Annual Figures"
["count"]=>
int(43)
}
[20]=>
array(2) {
["name"]=>
string(20) "Contract negotiation"
["count"]=>
int(41)
}
[21]=>
array(2) {
["name"]=>
string(19) "Foreign Development"
["count"]=>
int(40)
}
[22]=>
array(2) {
["name"]=>
string(33) "Materials Sourcing and Efficiency"
["count"]=>
int(37)
}
[23]=>
array(2) {
["name"]=>
string(17) "Electric Vehicles"
["count"]=>
int(37)
}
[24]=>
array(2) {
["name"]=>
string(19) "Government Policies"
["count"]=>
int(37)
}
[25]=>
array(2) {
["name"]=>
string(24) "Government Interventions"
["count"]=>
int(36)
}
[26]=>
array(2) {
["name"]=>
string(15) "Market Movement"
["count"]=>
int(34)
}
[27]=>
array(2) {
["name"]=>
string(10) "Divestment"
["count"]=>
int(32)
}
[28]=>
array(2) {
["name"]=>
string(34) "Physical Impacts of Climate Change"
["count"]=>
int(25)
}
[29]=>
array(2) {
["name"]=>
string(12) "Board Change"
["count"]=>
int(24)
}
}
}
861a7-nl-tennet-tso-bv
TenneT TSO B.V.
Location
Founded
Website
https://www.tennet.eu
Articles
3240 Articles
Category
Electric Services
Description
TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future.
Solar panels produced 21,393 gigawatt hours of electricity in the Netherlands last year. The most solar energy was generated in North Brabant: 3,819 gigawatts. Flevoland is at the bottom with 797 gigawatt hours.
“The grid operators should be ashamed,” says Almere climate mayor Chris Soebroto. According to him, energy companies surprise customers who supply clean energy with extra costs. For example, a lower feed-in tariff or a higher price per kWh of electricity purchased.
Transmission system operator TenneT and solar energy company sunvigo are testing how intelligently controlled solar roofs, storage and electric cars can reduce network bottlenecks. The potential is enormous: millions of networked PV systems and storage could potentially provide flexibility in the power grid
In 2023, 13 percent more green energy will be generated in the Netherlands than in 2022. Half of all electricity was green. In 2023, the electricity price was negative for 308 hours.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.