array(3) { ["company_details"]=> array(13) { ["name"]=> string(15) "TenneT TSO B.V." ["slug"]=> string(22) "861a7-nl-tennet-tso-bv" ["logo"]=> string(84) "https://images.businessradar.com/linkedin_logos/5a366392-afaa-46a3-89e7-f21fd7c71def" ["description"]=> string(1278) "TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future." ["address_street"]=> string(20) "Utrechtseweg 310 M01" ["address_place"]=> string(6) "Arnhem" ["address_region"]=> NULL ["founding_date"]=> NULL ["website_domain"]=> string(9) "tennet.eu" ["website_url"]=> string(21) "https://www.tennet.eu" ["industry_codes"]=> array(1) { [0]=> string(17) "Electric Services" } ["employee_count"]=> int(1191) ["article_count"]=> int(3240) } ["articles"]=> array(9) { [0]=> array(7) { ["title_en"]=> string(52) "TenneT wants to significantly reduce CO₂ emissions" ["snippet_en"]=> string(207) "TenneT wants to bring its CO2 emissions in line with the international climate goal of limiting global warming to 1.5 degrees. The greatest CO gain can be achieved from the construction of the offshore grid." ["url"]=> string(66) "https://energeia.nl/tennet-wil-co%E2%82%82-uitstoot-fors-verlagen/" ["image_url"]=> NULL ["source"]=> string(11) "energeia.nl" ["publication_date"]=> string(10) "2024-04-02" ["categories"]=> array(6) { [0]=> string(9) "Pollution" [1]=> string(19) "Green & Responsible" [2]=> string(17) "Energy Management" [3]=> string(18) "Expansion & Growth" [4]=> string(13) "GHG Emissions" [5]=> string(34) "Physical Impacts of Climate Change" } } [1]=> array(7) { ["title_en"]=> string(66) "Power grid too full for construction of new nuclear power stations" ["snippet_en"]=> string(170) "During the construction of the new nuclear power stations desired by the outgoing cabinet, bottlenecks will arise on the electricity grid in the Netherlands. That full..." ["url"]=> string(86) "https://fd.nl/politiek/3693272/1508915/stroomnet-te-vol-voor-bouw-nieuwe-kerncentrales" ["image_url"]=> NULL ["source"]=> string(5) "fd.nl" ["publication_date"]=> string(10) "2024-02-29" ["categories"]=> array(6) { [0]=> string(6) "Energy" [1]=> string(17) "Energy Management" [2]=> string(18) "Expansion & Growth" [3]=> string(13) "GHG Emissions" [4]=> string(6) "Outage" [5]=> string(17) "Academic Research" } } [2]=> array(7) { ["title_en"]=> string(94) "Planning approval for German high voltage power line accelerated thanks to reduced bureaucracy" ["snippet_en"]=> string(96) "The Clean Energy Wire produces and enables first-class journalism about the energy transition in" ["url"]=> string(124) "https://www.cleanenergywire.org/news/planning-approval-german-high-voltage-power-line-accelerated-thanks-reduced-bureaucracy" ["image_url"]=> NULL ["source"]=> string(19) "cleanenergywire.org" ["publication_date"]=> string(10) "2024-02-27" ["categories"]=> array(6) { [0]=> string(22) "Sustainable Investment" [1]=> string(6) "Energy" [2]=> string(19) "Green & Responsible" [3]=> string(17) "Energy Management" [4]=> string(13) "GHG Emissions" [5]=> string(20) "Alternative Energies" } } [3]=> array(7) { ["title_en"]=> string(50) "Climate mayor: 'Feed-in tax must be off the table'" ["snippet_en"]=> string(269) "“The grid operators should be ashamed,” says Almere climate mayor Chris Soebroto. According to him, energy companies surprise customers who supply clean energy with extra costs. For example, a lower feed-in tariff or a higher price per kWh of electricity purchased." ["url"]=> string(87) "https://www.1almere.nl/2024/02/22/klimaatburgemeester-terugleverheffing-moet-van-tafel/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/5499e361-9176-42e0-b7b6-8fcd1093889e" ["source"]=> string(10) "1almere.nl" ["publication_date"]=> string(10) "2024-02-22" ["categories"]=> array(7) { [0]=> string(19) "Government Policies" [1]=> string(6) "Energy" [2]=> string(19) "Green & Responsible" [3]=> string(17) "Energy Management" [4]=> string(13) "GHG Emissions" [5]=> string(34) "Physical Impacts of Climate Change" [6]=> string(23) "Supply Chain Management" } } [4]=> array(7) { ["title_en"]=> string(66) "Seatrium consortium to build third offshore wind project for Dutch" ["snippet_en"]=> string(171) "SEATRIUM and its consortium partner GE Vernova will build the third offshore wind project for the national electricity transmission system operator in Netherlands, TenneT." ["url"]=> string(121) "https://www.businesstimes.com.sg/companies-markets/seatrium-consortium-build-third-offshore-wind-project-dutch-electrical" ["image_url"]=> string(78) "https://images.businessradar.com/articles/88a5b3d2-82d0-4f87-acab-f7e4f7a805bb" ["source"]=> string(20) "businesstimes.com.sg" ["publication_date"]=> string(10) "2024-02-19" ["categories"]=> array(6) { [0]=> string(22) "Sustainable Investment" [1]=> string(6) "Energy" [2]=> string(17) "Energy Management" [3]=> string(18) "Expansion & Growth" [4]=> string(13) "Collaboration" [5]=> string(13) "GHG Emissions" } } [5]=> array(7) { ["title_en"]=> string(43) "Network expansion for the energy transition" ["snippet_en"]=> string(273) "The prerequisite for the energy transition is to transport wind power from north to south. In order for this to be successful, not only above-ground power lines are needed, but also many kilometers of underground cables that are installed in a cable protection pipe system." ["url"]=> string(53) "https://baublatt.de/netzausbau-fuer-die-energiewende/" ["image_url"]=> string(78) "https://images.businessradar.com/articles/46b40996-8485-446a-a758-684c289e5efe" ["source"]=> string(11) "baublatt.de" ["publication_date"]=> string(10) "2024-02-08" ["categories"]=> array(5) { [0]=> string(6) "Energy" [1]=> string(17) "Energy Management" [2]=> string(18) "Expansion & Growth" [3]=> string(13) "GHG Emissions" [4]=> string(20) "Alternative Energies" } } [6]=> array(7) { ["title_en"]=> string(68) "Grid congestion reducing German North Sea wind production – Tennet" ["snippet_en"]=> string(132) "Read Grid congestion reducing German North Sea wind production – Tennet and other wind energy news & analysis on Windpower Monthly" ["url"]=> string(117) "https://www.windpowermonthly.com/article/1860641/grid-congestion-reducing-german-north-sea-wind-production-–-tennet" ["image_url"]=> string(78) "https://images.businessradar.com/articles/54d2c127-f2f3-47f5-ac9c-07a76077ccdb" ["source"]=> string(20) "windpowermonthly.com" ["publication_date"]=> string(10) "2024-02-07" ["categories"]=> array(7) { [0]=> string(6) "Energy" [1]=> string(17) "Energy Management" [2]=> string(17) "Production Issues" [3]=> string(18) "Ecological Impacts" [4]=> string(18) "Expansion & Growth" [5]=> string(13) "GHG Emissions" [6]=> string(20) "Alternative Energies" } } [7]=> array(7) { ["title_en"]=> string(93) "TenneT - "Wind yield" in the Dutch and German North Sea generates more than 30 terawatt hours" ["snippet_en"]=> string(143) "Electric Energy News Automation/IT | T&D | Climate Change | Generation | Hydroelectricity | Solar | Wind | Appointments | Financial | Oil & Gaz" ["url"]=> string(162) "https://electricenergyonline.com/article/energy/category/wind/163/1062940/-wind-yield-in-the-dutch-and-german-north-sea-generates-more-than-30-terawatt-hours.html" ["image_url"]=> NULL ["source"]=> string(24) "electricenergyonline.com" ["publication_date"]=> string(10) "2024-01-30" ["categories"]=> array(13) { [0]=> string(22) "Sustainable Investment" [1]=> string(6) "Energy" [2]=> string(29) "Environmental & Social Impact" [3]=> string(19) "Government Policies" [4]=> string(19) "Green & Responsible" [5]=> string(17) "Energy Management" [6]=> string(18) "Ecological Impacts" [7]=> string(13) "GHG Emissions" [8]=> string(17) "Electric Vehicles" [9]=> string(34) "Physical Impacts of Climate Change" [10]=> string(24) "Systemic Risk Management" [11]=> string(20) "Alternative Energies" [12]=> string(8) "Activism" } } [8]=> array(7) { ["title_en"]=> string(94) "Lack of grid capacity lets output of Germany’s North Sea offshore wind turbines drop in 2023" ["snippet_en"]=> string(96) "The Clean Energy Wire produces and enables first-class journalism about the energy transition in" ["url"]=> string(119) "https://www.cleanenergywire.org/news/lack-grid-capacity-lets-output-germanys-north-sea-offshore-wind-turbines-drop-2023" ["image_url"]=> NULL ["source"]=> string(19) "cleanenergywire.org" ["publication_date"]=> string(10) "2024-01-29" ["categories"]=> array(8) { [0]=> string(22) "Sustainable Investment" [1]=> string(6) "Energy" [2]=> string(19) "Green & Responsible" [3]=> string(17) "Energy Management" [4]=> string(7) "Renewal" [5]=> string(18) "Expansion & Growth" [6]=> string(13) "GHG Emissions" [7]=> string(20) "Alternative Energies" } } } ["category_annotations"]=> array(30) { [0]=> array(2) { ["name"]=> string(17) "Energy Management" ["count"]=> int(948) } [1]=> array(2) { ["name"]=> string(19) "Green & Responsible" ["count"]=> int(396) } [2]=> array(2) { ["name"]=> string(20) "Alternative Energies" ["count"]=> int(346) } [3]=> array(2) { ["name"]=> string(6) "Energy" ["count"]=> int(296) } [4]=> array(2) { ["name"]=> string(18) "Expansion & Growth" ["count"]=> int(260) } [5]=> array(2) { ["name"]=> string(15) "Deals & Tenders" ["count"]=> int(254) } [6]=> array(2) { ["name"]=> string(6) "Outage" ["count"]=> int(177) } [7]=> array(2) { ["name"]=> string(13) "Collaboration" ["count"]=> int(147) } [8]=> array(2) { ["name"]=> string(18) "General Investment" ["count"]=> int(145) } [9]=> array(2) { ["name"]=> string(5) "Legal" ["count"]=> int(93) } [10]=> array(2) { ["name"]=> string(13) "GHG Emissions" ["count"]=> int(92) } [11]=> array(2) { ["name"]=> string(5) "Award" ["count"]=> int(91) } [12]=> array(2) { ["name"]=> string(18) "Ecological Impacts" ["count"]=> int(76) } [13]=> array(2) { ["name"]=> string(11) "Acquisition" ["count"]=> int(71) } [14]=> array(2) { ["name"]=> string(8) "Politics" ["count"]=> int(64) } [15]=> array(2) { ["name"]=> string(14) "Product Launch" ["count"]=> int(58) } [16]=> array(2) { ["name"]=> string(19) "Investment Requests" ["count"]=> int(53) } [17]=> array(2) { ["name"]=> string(22) "Sustainable Investment" ["count"]=> int(49) } [18]=> array(2) { ["name"]=> string(5) "R & D" ["count"]=> int(48) } [19]=> array(2) { ["name"]=> string(24) "Quarterly/Annual Figures" ["count"]=> int(43) } [20]=> array(2) { ["name"]=> string(20) "Contract negotiation" ["count"]=> int(41) } [21]=> array(2) { ["name"]=> string(19) "Foreign Development" ["count"]=> int(40) } [22]=> array(2) { ["name"]=> string(33) "Materials Sourcing and Efficiency" ["count"]=> int(37) } [23]=> array(2) { ["name"]=> string(17) "Electric Vehicles" ["count"]=> int(37) } [24]=> array(2) { ["name"]=> string(19) "Government Policies" ["count"]=> int(37) } [25]=> array(2) { ["name"]=> string(24) "Government Interventions" ["count"]=> int(36) } [26]=> array(2) { ["name"]=> string(15) "Market Movement" ["count"]=> int(34) } [27]=> array(2) { ["name"]=> string(10) "Divestment" ["count"]=> int(32) } [28]=> array(2) { ["name"]=> string(34) "Physical Impacts of Climate Change" ["count"]=> int(25) } [29]=> array(2) { ["name"]=> string(12) "Board Change" ["count"]=> int(24) } } } 861a7-nl-tennet-tso-bv

TenneT TSO B.V.

Location

Founded

Website

https://www.tennet.eu

Articles

3240 Articles

Category

Electric Services

Description

TenneT TSO is a European grid operator that is responsible for maintaining and operating high-voltage transmission grids in the Netherlands and Germany. They own approximately 23,900 kilometers of high-voltage lines and cables, supplying electricity to 42 million homes and businesses. TenneT's history dates back to the early days of electricity, with Dutch electrical pioneer Willem Benjamin Smit building the country's first power station in 1886. The company was formally appointed to operate the national high-voltage transmission grid in the Netherlands in 1998 and acquired the German high-voltage grid from E.ON in 2010, becoming Europe's first cross-border transmission system operator. TenneT is focused on the energy transition and the integration of renewable energy sources into their grid. They are responsible for maintaining the balance between supply and demand, investing in new infrastructure, and ensuring all market parties can access the grid. They also play a prominent role in developing a cross-border market for distributing electricity in the North West European region. TenneT is committed to providing a secure and reliable supply of electricity while driving the energy transition towards a more sustainable, reliable, and affordable energy future.

Articles

TenneT wants to significantly reduce CO₂ emissions

2024-04-02 (energeia.nl)

TenneT wants to significantly reduce CO₂ emissions

TenneT wants to bring its CO2 emissions in line with the international climate goal of limiting global warming to 1.5 degrees. The greatest CO gain can be achieved from the construction of the offshore grid.

Read more
Power grid too full for construction of new nuclear power stations

2024-02-29 (fd.nl)

Power grid too full for construction of new nuclear power stations

During the construction of the new nuclear power stations desired by the outgoing cabinet, bottlenecks will arise on the electricity grid in the Netherlands. That full...

Read more
Planning approval for German high voltage power line accelerated thanks to reduced bureaucracy

2024-02-27 (cleanenergywire.org)

Planning approval for German high voltage power line accelerated thanks to reduced bureaucracy

The Clean Energy Wire produces and enables first-class journalism about the energy transition in

Read more
Climate mayor: 'Feed-in tax must be off the table'

2024-02-22 (1almere.nl)

Climate mayor: 'Feed-in tax must be off the table'

“The grid operators should be ashamed,” says Almere climate mayor Chris Soebroto. According to him, energy companies surprise customers who supply clean energy with extra costs. For example, a lower feed-in tariff or a higher price per kWh of electricity purchased.

Read more
Seatrium consortium to build third offshore wind project for Dutch

2024-02-19 (businesstimes.com.sg)

Seatrium consortium to build third offshore wind project for Dutch

SEATRIUM and its consortium partner GE Vernova will build the third offshore wind project for the national electricity transmission system operator in Netherlands, TenneT.

Read more
Network expansion for the energy transition

2024-02-08 (baublatt.de)

Network expansion for the energy transition

The prerequisite for the energy transition is to transport wind power from north to south. In order for this to be successful, not only above-ground power lines are needed, but also many kilometers of underground cables that are installed in a cable protection pipe system.

Read more
Grid congestion reducing German North Sea wind production – Tennet

2024-02-07 (windpowermonthly.com)

Grid congestion reducing German North Sea wind production – Tennet

Read Grid congestion reducing German North Sea wind production – Tennet and other wind energy news & analysis on Windpower Monthly

Read more
TenneT - "Wind yield" in the Dutch and German North Sea generates more than 30 terawatt hours

2024-01-30 (electricenergyonline.com)

TenneT - "Wind yield" in the Dutch and German North Sea generates more than 30 terawatt hours

Electric Energy News Automation/IT | T&D | Climate Change | Generation | Hydroelectricity | Solar | Wind | Appointments | Financial | Oil & Gaz

Read more
Lack of grid capacity lets output of Germany’s North Sea offshore wind turbines drop in 2023

2024-01-29 (cleanenergywire.org)

Lack of grid capacity lets output of Germany’s North Sea offshore wind turbines drop in 2023

The Clean Energy Wire produces and enables first-class journalism about the energy transition in

Read more

Newsletter subscription